Hostel renovation

Dear Partner in Missions,

In keeping with our mandate to recruit and train people from all walks of life and diverse educational backgrounds, in our in-depth character building and life transforming cross cultural training programmes, we have decided to respond to the dire need to renovate our students’ hostel, a block of 6 (six) self-contained apartments, with kitchen and toilet.

Its walls are cracked, the floors have potholes patched over and over, doors and windows are weak, ceilings are falling down, (some are down already), and the roof is leaking. Summarily, it is unbefitting for a citadel of learning.

We are hereby making this clarion call to you, our esteemed partner, to join in this Nehemiah project to rebuild the broken walls that provide shelter where lives are being discipled and adequately equipped for missionary service in the complex 21st century frontiers.

We would like to encourage you to give generously to this renovation project as our targeted budget is three million, five hundred thousand naira (N3.5M). Please remember that nothing is too small in His sight and not a single cheerful generous act will go unrewarded.

Please make your donations to:

Bank: UBA.

Account Name: Agape Missions National.

Account Number: 1020046692

Building material donations can be made to:

Agape Missions Base, Gana Ropp, Barkin Ladi Local Government Area, Plateau State.

Attached is a breakdown of the proposed estimate for the renovation.

Thank you for considering this project and giving generously.

Shalom and God bless you.

Yours in God’s Mission,

SIGNED

YAKUBU MUSA

National Director

+2347031201509, +2348023020700

 

PROPOSED ESTIMATE FOR AGAPE SCHOOL OF MISSIONS HOSTELS’ REPAIR.

Roof and Ceiling (materials & labour)—-N1,534,500

Cements (100 bags)——————————–N450,000

Doors (12 doors)————————————-N390,000

Windows (18 windows)—————————N321,000

Plumbing————————————————-N150,000

Labour—————————————————–N180,000

Sand (20 trips for floor,columns etc.)——N140,000

Painting—————————————————N80,000

Contingency——————————————–N180,000

TOTAL—————————————————N3,425,500